Cornerstone Earth Group, Inc. performed a geotechnical investigation and provided Geotechnical Observation and Testing Services for 𝗚𝗼𝗼𝗴𝗹𝗲 in support of the construction of a new pedestrian bridge crossing the West Channel at 1212 Bordeaux Drive in Sunnyvale. The project consisted of the realignment and installation of approximately 405 feet of storm drain, installation of 650 lineal feet of flood walls behind the channel banks, and a 45-foot-long free span pedestrian bridge.